HAL imposes ‘contractual penalties’ on GE for Tejas engine delivery delay; PSU chief says Russia made presentation on Su-57 jet Hindustan Aeronautics Limited anticipates receiving 20 F404 engines from General Electric by December, with a sixth for the Tejas Mark 1A expected by April-end. HAL is imposing contractual penalties on GE for engine supply delays. Meanwhile, all 34 Tejas jets are set to resume flying from April 8 after software issues were resolved, following a recent grounding incident. #General_Electric #Aeronautics_Limited #Hindustan_Aeronautics #jet_Hindustan #PSU_chief #Russia_made #Limited_anticipates #Tejas_Mark #HAL_imposes #anticipates_receiving

5 LCA Mk1A fighter jets fully ready for delivery to IAF: HAL HAL said that “an additional nine aircraft have already been built and flown. Upon receipt of engines from General Electric (US company), these aircraft will be made ready for delivery”. “All design and development issues identified are being addressed in an expedited manner. HAL is in active discussions with IAF to deliver the aircraft at the earliest,” it said in a statement. #fighter_jets #LCA #General_Electric #jets_fully #fully_ready #HAL #HAL_HAL #IAF #fighter #flown
